Enterprise architecture for the firm, rendered from the model repository. Single source of truth is the repo; this site is a read-only projection.

Reading path

  1. PROJECT - what this system is, the domain map, and the roadmap
  2. CONVENTIONS - how cells, DIDs, seams, and statuses work
  3. Diagram atlas - every diagram, grouped by category
  4. One worked domain end to end: D-01 Intelligence or D-02 Protective Operations

Domains

Cross-cutting

How to read a cell

Every deliverable cell carries frontmatter: a DID (immutable identifier), status (stub, drafted, needs-revision, approved), classification, and its dependency wiring (inputs, produces_for, provides, requires). Approved means the cell passed the V1/V2/V3 promotion gate; drafted content is real but not yet independently verified. The “Model wiring” section on each cell page and the graph view are generated from that frontmatter.