[OPERATION - ENGAGEMENT REF] - Advance Mission Map
EP-022 Advance Mission Playbook - execution workspace for the physical advance. Central topic = the tasked advance mission (venues, route, window). Branches = the ordered phases and gates the advance element runs from tasking to brief-back. Tick each leaf as completed; fill bracketed fields as ground truth replaces the desk study. Clone the recursive serial blocks (venue walk, route recon, liaison contact) once per venue/route/contact. → executes EP-022 in full; seeded by EP-020 gate G2 (venues and window fixed); feeds EP-002, EP-003, and EP-020 gate G3.
00 * Process Plan - Gates & Triggers
The trigger that starts this advance and the boundary checks it must clear before any leaf below is worked. → EP-022 SS1 Purpose and Boundaries, Mission Snapshot.
Entry trigger
- EP-020 gate G2 passed (confirmed with Team Leader / Ops Manager)
- Intelligence baseline on hand (ART-protective-intel-assessment, ART-travel-risk-assessment)
- Venues and on-site window fixed and logged: Venues Tasked: [ ] / On-Site Window: [ ]
- Advance Lead (initials): [ ]
- Element size: [1 / 2 operators]
- Cycle instance / gate state: [EP-020 REF - post-G2]
Boundary check (do not proceed if any is false)
- Decision: [ ] The advance observes, records, coordinates only - no contract negotiation (routes to Operations Manager / BIZ)
- Decision: [ ] No surveillance of persons undertaken here (that is EP-007/EP-008 tasking)
- Decision: [ ] No security posture committed beyond what G4 has approved
Output contract (what this advance must produce to close)
01 * Advance Tasking & Kit
Preparation before departure; incomplete preparation is a logged deviation per EP-020. → EP-022 SS2 Phase 1: Preparation.
Read-on register
- Itinerary reviewed
- EP-001 principal profile extract reviewed
- ART-protective-intel-assessment reviewed
- ART-travel-risk-assessment (cross-border) reviewed
- Region package legal annex reviewed
- Region package medical infrastructure section reviewed
- Region package LE liaison protocol reviewed
Desk study per venue
Clone per venue.
- [venue - e.g. Hotel Meridian, Site A]
- Imagery / mapping pass complete
- Draft site diagram produced
- Access points, parking, adjacent structures noted
- Open questions only ground truth can answer: [ ]
Route desk study
- Candidate primary route identified per EP-003 method
- Candidate alternate route(s) identified per EP-003 method
- Hospital / trauma set drawn from region package
- Chokepoints to ground-truth: [ ]
Appointments & documentation
- Venue security/management contact windows booked (→ Branch 04 Liaison)
- Access authority confirmed in writing where required
- Credentials on hand
- Engagement letter extract / authority-to-survey on hand where required
- Jurisdiction licensing cards on hand
- Kit checked per Branch 99 Advance Kit register
- Comms check complete per EP-011
Itinerary filed with Operations Manager
- Travel plan filed
- Lodging filed (BIZ-008 assessment referenced where applicable)
- Daily check-in schedule agreed
- Overdue procedure: [ ]
02 * Deployment & Arrival
Travel and first-day orientation before any venue appointment. → EP-022 SS3 Phase 2: Deployment and Arrival.
- Travel conducted low profile - nothing in dress, luggage, or conversation identifies client or purpose
- Checked in with Operations Manager on the engagement net
- Local SIM/data plan confirmed; comms check per EP-011
- Orientation drive of the area of operations completed before first appointment
- General layout / traffic rhythm: [ ]
- Police presence and posture: [ ]
- Current events on ground vs. assessment: [ ]
- Fast-aging facts verified: construction, closures, event calendars overlapping visit window
03 * Venue Walk (per venue)
The fixed 8-step walk sequence so nothing is skipped under time pressure. Record against the EP-002 skeleton as you go; do not reconstruct from memory. → EP-022 SS4 Phase 3: Venue Survey Conduct.
Venue walk serial
Clone per venue. Complete all 8 steps in order.
- [venue - e.g. Site A]
- Step 1 - Exterior orbit: approaches, sightlines, standoff, adjacent occupancies, surveillance perches, camera coverage, lighting state at visit hour
- Step 2 - Arrival point: embus/debus geometry, cover from view, door-to-door distance, control of arrival box, alternate arrival point
- Step 3 - Access control: entrances in use, screening posture, credentialing, who controls the door, badge/escort rules
- Step 4 - Interior route: door to function space; primary and alternate holds with lock state and egress; elevators vs. stairs; nearest principal restroom option
- Step 5 - Function space: seating relative to exits, backdrop exposure (photography, windows), crowd configuration, staff access during activity
- Step 6 - Emergency egress: two routes minimum from every principal location walked physically; doors that lock behind noted; alarm-on-exit noted
- Step 7 - Life safety: nearest AED located, fire posture noted, venue medical room located, nearest trauma center confirmed by drive time at visit hour
- Step 8 - Comms dead spots: detail net and cellular checked at hold, function space, and egress stairwells; failures logged for EP-011
- Per-venue minimum record: [ ] annotated diagram / [ ] photo set keyed to diagram / [ ] contact list / [ ] completed EP-002 sections
- Gaps (marked as gaps, never guessed): [ ]
- [venue 2]
04 * Route Reconnaissance (per route)
Ground-truth every primary and alternate route at the planned movement hour. → EP-022 SS5 Phase 4: Route Reconnaissance.
Route recon serial
Clone per route: primary / alternate / emergency.
- [route - e.g. Lodging → Site A, primary]
- Driven at planned movement hour (or timing delta noted for other hours)
- Chokepoints recorded per EP-003
- One-way sections recorded
- Illegal-turn traps recorded
- Overpasses / tunnels recorded
- Ambush-favorable geometry recorded
- Safe havens recorded (staffed 24h, vehicle-accessible)
- Fuel points recorded
- Trauma centers on route recorded
- Embus/debus at both ends validated against venue arrival geometry (→ Branch 03)
- Route time: [ ] / Variance drivers (school hours, market days, events): [ ]
- Decision: [ ] Alternate diverges early enough to matter (rejoins-before-chokepoint fails this test)
- [route 2 - alternate]
- [route 3 - emergency]
05 * Liaison
Liaison is conducted to the region package protocol; commitments are recorded, not remembered. → EP-022 SS6 Phase 5: Liaison.
Liaison contact serial
Clone per contact: venue security/management, law enforcement, medical, vendor.
- [contact - e.g. Venue Security Manager]
- Category: [venue security-management / law enforcement / medical / vendor]
- Visit mechanics agreed
- Screening exceptions for the party agreed (where applicable)
- Staff notification scope agreed (minimum necessary)
- House emergency procedures obtained
- Points of contact for visit day recorded
- Identity / agreement / limits (LE contacts only, per region package annex): [ ]
- Commitment recorded in liaison record attached to EP-002: [ ]
- [contact 2]
Medical and vendor checks
- Trauma center capabilities confirmed where region package flags them unverified
- Locally contracted support validated against ART-vendor-roster via Operations Manager (advance validates, does not procure)
06 * Vulnerabilities & Mitigations
Operational security posture the advance element itself maintains while conducting the survey. → EP-022 SS8 Advance Profile and Operational Security.
- Cover for status: [business travel / event logistics] consistent with venue’s normal traffic
- Client not named to third parties absent an approved liaison script
- Pattern discipline maintained - times/order of repeated venue visits varied
- No repeated parking that would draw notice
- Passive surveillance awareness run for hostile pre-attack indicators (EP-008 indicator set); no dedicated detection run unless separately tasked under EP-024
- Photos, diagrams, notes held on encrypted devices per SYS-003 baseline
- No venue material posted, synced, or emailed outside the engagement file
07 * Advance Report Handoff (EP-002/EP-003)
Drafting while observations are fresh, and the brief-back that carries the mission’s gate. → EP-022 SS7 Phase 6: Drafting and Brief-Back.
- EP-002 drafted per venue same day while observations are fresh
- EP-003 finalized while on site
- Open items flagged (each with a recommendation):
- [open item] - Recommendation: [accept / mitigate / re-survey]
- [open item 2] - Recommendation: [ ]
- Brief-back delivered to Team Leader within [24] hours of return
- Format used: EP-002 summary + open items + advance’s posture recommendation per venue
- G3 review outcome (EP-020): [ ] Accepted / [ ] Corrective action looped - detail: [ ]
08 * Actions-On
Immediate actions and follow-through for the things that go wrong on an advance; keep this branch open throughout Branches 02-07. → EP-022 SS9 Actions-On.
Actions-on serial
Clone per triggered event; log time and disposition.
- [event - e.g. Access denied at venue]
- Trigger matched: [Access denied / Advance element challenged / Advance compromised / Suspected hostile surveillance / Overdue-lost comms / Serious incident in AO]
- Immediate action taken: [ ]
- Then / escalation: [ ]
- Time logged: [ ]
- Reported to: [Ops Manager / Team Leader]
- [event 2]
Reference table (do not deviate from these immediate actions)
- Access denied at venue → Do not force or argue past a refusal; withdraw politely → Escalate to Ops Manager for client-channel authorization; reschedule
- Advance element challenged (venue/security/LE) → Identify per approved script and credentials; comply with lawful direction → Log; assess whether profile is blown
- Advance compromised (purpose exposed) → Cease survey activity; unremarkable exit → Report to Team Leader; assess itinerary/venue change per EP-020 replan trigger
- Suspected hostile surveillance of the advance → Do not confront; break contact by routine means; note descriptors → Report per EP-008 indicator format; Team Leader decides SD tasking
- Overdue / lost comms with firm → Execute filed overdue procedure → Ops Manager initiates welfare sequence at [T+X h]
- Serious incident in AO during advance → Move to safe location; account for element → Report; Team Leader decides continue/abort per EP-020 no-go floor
99 * Execution Admin
Running decision/deviation log, product register, sign-offs, and open actions for this advance. → EP-022 SS10 Advance Kit and overall mission closure against EP-020.
Advance kit register (verify before departure, → Branch 01)
- Individual loadout per SYS-009 (jurisdiction-adjusted; armed carriage only where licensed, otherwise explicitly unarmed)
- Comms per SYS-003: hardened handset, engagement comms plan loaded, local SIM/data arranged
- Survey tools: laser measurer or pacing standard, camera, diagram templates, printed venue imagery
- SA kit (SYS-004) - deploy only if static hold / extended pre-positioning tasked; otherwise stages with detail
- Individual IFAK per SYS-009
Decision / deviation log (running)
- [date/time] - [decision or deviation] - [rationale] - [logged by]
Product register
- EP-002 (per venue): [status - drafted / reviewed / final]
- EP-003: [status]
- Liaison record: [status]
- Brief-back package: [status]
Sign-offs
- Advance Lead: [initials / date]
- Team Leader (G3 acceptance): [initials / date]
Open actions / RFIs
- [open item] → route to [Branch / EP-020 replan / external product]
- [open item 2]
END OF MAP