Travel Security Package
Deliverable EP-018. Structure per cc02-standards/PACKAGE-STANDARD.md. A package composes two or more heterogeneous typed components; no nested packages.
1. Package Definition
The Travel Security Package is a consolidated, mission-ready operational suite prepared for principal travel outside the home region. It bundles site surveys, route assessments, communications protocols, medical emergency plans, and secure transport allocations into a single coordinated operational package.
2. Component Manifest
The package composes the following heterogeneous typed deliverables:
| Component | Type | Source (DID or path) | Standard |
|---|---|---|---|
| Advance Survey Report | report | EP-002 | TEMPLATE-STANDARD |
| Route Analysis | report | EP-003-route-analysis | TEMPLATE-STANDARD |
| Executive Transport Service | service | EP-015 | SERVICE-STANDARD |
| Secure Comms Plan | report | [EP-011] | TEMPLATE-STANDARD |
| Emergency Action Plan | report | [EP-012] | TEMPLATE-STANDARD |
Verification Note: EP-002 and EP-003 edges exist already as inputs to this package cell, providing the baseline geodata and site checks.
3. Dependency and Traceability Notes
- The EP-015-executive-transport-service consumes primary and alternate route choices established in EP-003-route-analysis.
- Emergency Action Plan [EP-012] maps evacuation hospital routing coordinates using data verified in EP-002.
4. Systems Engineering Specifications
4.1 Stakeholder Needs:
- NEED-EP-018-01: The protective detail requires a unified, structured travel package containing all critical intelligence and operational parameters prior to boarding.
- Source: Team Leader (RF)
- Context: Disjointed plans and uncoordinated communication structures increase vulnerability during international transit.
4.2 System Requirements:
- REQ-EP-018-01 (Traceability: NEED-EP-018-01): When a travel engagement is initialized, the Travel Security Package shall pull the regional threat metrics from the corresponding ART-region-package within four hours of activation [VR-TRAVEL-PKG-01].
- Verification Method: Test (T)
- REQ-EP-018-02 (Traceability: NEED-EP-018-01): When operating in a high-threat region, the Travel Security Package shall mandate in-person physical advance surveys for all primary venues [VR-TRAVEL-PKG-02].
- Verification Method: Inspection (I)
5. Activation Flow and Master Timeline
Travel Security Package activation is triggered upon receipt of the ART-engagement-order. Operational actions follow a gated timeline:
- T-14d:
- T-7d:
- Determine advance team deployment posture based on country risk tier.
- Advance Posture Rule: In-person physical advance team deployment is mandatory for Tier 3 and Tier 4 country risk ratings. Remote advance is acceptable only for Tier 1 and Tier 2 country risk ratings.
- T-72h:
- Lock venue [EP-002] and route [EP-003] surveys.
- Draft the Emergency Action Plan [EP-012] and issue the Secure Comms Plan [EP-011].
- T-24h:
- Conduct the final team operational brief.
- Re-check weather patterns and route closures.
- T-0: Execute movement.
- T+24h: Trigger After-Action Report (AAR).
6. In-Country Support Integration
- Supplier Sourcing: All local security drivers, armed security escorts, and auxiliary guards must be drawn through the
ART-vendor-rosterseam. - Local Liaison: Detail Leader must verify contact protocols with municipal police coordinators.
- Fixer Vetting Floor: Local coordinators (“fixers”) must pass D-01 background integrity checks before team deployment.
7. Risk-Tier Scaling Table
Security assets scale dynamically based on the country risk tier parsed from the region package:
| Country Risk Tier | Advance Survey [EP-002] | Transport Armor [EP-015] | EAP [EP-012] | Comms Plan [EP-011] | In-Country Fixer |
|---|---|---|---|---|---|
| Tier 1 (Low) | Remote | Soft-skin / B4 | Standard | Cell phone | Optional |
| Tier 2 (Moderate) | Remote | CEN Level B4 | Standard | Encrypted Radio | Optional |
| Tier 3 (High) | Physical | CEN Level B6 | Hardened Core | Satellite / Radio | Mandatory |
| Tier 4 (Critical) | Physical | CEN Level B6 / B7 | Hardened Core | Sat / Radio / CP | Mandatory |
8. Deliverable Manifest Per Engagement
- Checklist for Deployment:
- [EP-002] Advance Survey. Owner: Detail Leader. Gate: Locked at T-72h.
- [EP-003] Route Analysis. Owner: Driver. Gate: Locked at T-72h.
- [EP-015] Transport Plan. Owner: Driver. Gate: Approved at T-24h.
- [EP-011] Comms Plan. Owner: CP Coordinator. Gate: Issued at T-72h.
- [EP-012] Emergency Action Plan. Owner: Detail Leader. Gate: Signed at T-72h.
END OF PACKAGE
Model wiring
Generated from cell frontmatter at publish time.