[DETAIL - ENGAGEMENT REF] - Detail Execution Map
EP-023 Detail Execution Playbook - day-of-operations workspace for a deployed overt protective detail. Central topic = today’s detail (one engagement reference, one 24-hour cycle). Branches = the playbook’s phases and gates in execution order, from shift start to rest-overnight reset. Tick each leaf as the element completes it; log deviations and decisions where the branch calls for it, not after the fact. → executes EP-023 Detail Execution Playbook in full; runs inside the EP-021 battle rhythm and under the EP-010 OPORD, which this map does not replan. Clone this whole map per detail-day.
00 * Process Plan - Gates & Triggers
The trigger that opens today’s detail cycle and the boundary conditions that must hold before any movement is committed. → EP-023 SS1 Purpose and Boundaries.
Boundary check
- Governing OPORD confirmed current: EP-010 ref [ ]
- Today’s brief (EP-016) read by all posted personnel before the principal’s day starts
- Comms settings (EP-011) and standing post orders (EP-009) confirmed unchanged since last cycle
- No-go / abort criteria for today’s movements extracted from the OPORD and briefed
- Decision: [ ] Detail cleared to open today’s cycle - authority: Team Leader
Handoff boundaries (do not improvise these)
- Immediate-action triggers (contact / medical / fire / evacuation) mapped to EP-025 drills under the EP-012 plan - confirmed briefed, not exercised ad hoc
- Handoff point and resume point for an EP-025 drill understood by every position
- Notes / boundary exceptions today: [ ]
00b * Battle Rhythm & Triggers
Where today’s cycle sits inside the standing battle rhythm; the cadence and handover triggers this detail-day inherits and closes out. → EP-023 SS2 step 1 (arrival per EP-021 cycle) and SS8 step 4 (daily log closure, next-day M-hour) - binds to EP-021 in full.
- Today’s M-hour and first movement time confirmed against the EP-021 daily cycle
- Posture band for today read from the daily brief: [Low / Moderate / Elevated / High / Critical]
- Escalation trigger (posture step-up on band crossing): → 06 Running Decision Points
- Evening sync scheduled - time: [ ]
- Daily log carried forward from prior cycle reviewed for open items
01 * Shift Start / Handover
Arrival, kit, comms, and handover sequence before any element takes post or the principal’s day begins. → EP-023 SS2 Shift Start.
- Arrived per EP-021 daily cycle; daily brief (EP-016) read before taking post
- Kit and vehicle checks complete per SYS-009 / SYS-010 checklists
- Deficiencies reported to Shift Lead: [ ] - before principal’s day starts, not after
- Comms check all nets per EP-011 complete
- Duress word confirmed: [ ]
- Common operating picture (ART-common-operating-picture) live on all required devices
- Today’s movement set, arrival geometry (EP-002 venue advance), and no-go/abort criteria confirmed
Handover serial
Clone per relieving element / post. → EP-023 SS2 step 4; procedure per EP-021 SS3.
- [position / net - e.g. Post 2 / Command net]
- Outgoing element briefs status, open items, and any unresolved deviation
- Oncoming Shift Lead accepts handover by name on the command net
- Post orders (EP-009) reconfirmed current for this position
- Time of handover: [ ]
- Notes / discrepancies: [ ]
- [position / net 2]
- Outgoing element briefs status, open items, and any unresolved deviation
- Oncoming Shift Lead accepts handover by name on the command net
- Post orders (EP-009) reconfirmed current for this position
- Time of handover: [ ]
- Notes / discrepancies: [ ]
02 * Static / RON Posture
Venue occupation while static and rest-overnight posture at day’s close - the two states where the detail is not moving. → EP-023 SS6 Venue Occupation and SS8 Rest-Overnight (RON) Reset.
Venue occupation (static posture)
- Posts assigned per EP-009 and OPORD task matrix: access point coverage, hold security, close cover
- Hold route walked by at least one operator on arrival; door state and egress confirmed
- Crowd / access rhythm watched against advance baseline (staff flow, badge status)
- Anomaly observed: [unscheduled staff / unbadged access / fixated person - ATAP indicator] → reported on detail net and logged
- Principal internal movements announced on net before they happen
- Formation collapse/expand executed per space and OPORD defaults
- Net discipline maintained - routine traffic held, net clear for exception traffic
RON reset (end of cycle)
- Residence / hotel posture established per EP-009 before manning reduces
- Vehicles: fuel level [>=3/4], faults reported: [ ], kit restowed per SYS-010, then secured
- Radios and handsets on charge
- Medical kit seals checked - discrepancies logged
- Daily log closed per EP-021
- Next-day M-hour and first movement confirmed at evening sync
- Overnight watch posted: [Yes / No] - handover per EP-021 SS3 if yes
- Overnight exception reporting channel confirmed per EP-011
03 * Movement Serials
En-route crew discipline for every leg run today. Governed by EP-004; this branch is the execution checklist, not the movement plan itself. → EP-023 SS4 Movement Execution.
Movement leg serial
Clone per leg run today.
- [leg - e.g. Residence → Venue A (Route Bravo)]
- Positions and spacing set per EP-004 for today’s vehicle count
- Protection vehicle maintains sight of principal vehicle throughout
- Waypoint calls made at OPORD-designated points
- Route deviation called before the turn: [Yes / N-A]
- Driver drives only; escort observes and communicates; navigation load off the wheel
- Planned halts only, at EP-003 surveyed points: [ ]
- Unplanned halt occurred: [Yes / No] - if yes, minimum duration, escort dismount per formation drill
- Route deviation authority exercised: → 06 Running Decision Points
- Forced deviation (blockage / police direction): [ ] - new route letter reported immediately: [ ]
- Possible-follow indicator logged: [ ] - format per EP-008; confirmation run tasked to EP-024, not improvised with principal aboard
- Departure call made (element / principal count / route letter / ETA): [ ]
- Notes / decision log: [ ]
- [leg 2]
- Positions and spacing set per EP-004 for today’s vehicle count
- Protection vehicle maintains sight of principal vehicle throughout
- Waypoint calls made at OPORD-designated points
- Route deviation called before the turn: [Yes / N-A]
- Driver drives only; escort observes and communicates; navigation load off the wheel
- Planned halts only, at EP-003 surveyed points: [ ]
- Unplanned halt occurred: [Yes / No] - if yes, minimum duration, escort dismount per formation drill
- Route deviation authority exercised: → 06 Running Decision Points
- Forced deviation (blockage / police direction): [ ] - new route letter reported immediately: [ ]
- Possible-follow indicator logged: [ ] - format per EP-008; confirmation run tasked to EP-024, not improvised with principal aboard
- Departure call made (element / principal count / route letter / ETA): [ ]
- Notes / decision log: [ ]
04 * Arrival / Departure Sequences
The three point-transitions of the day: leaving the residence, arriving at a venue, and the departure/return leg. → EP-023 SS3 Residence Departure Sequence, SS5 Arrival Sequence, SS7 Departure and Return.
Departure point serial
Clone per departure from a controlled point (residence or venue).
- [point - e.g. Residence]
- Exterior check of departure point and vehicle line complete before principal is committed (EP-009 residence posts where manned)
- Vehicles staged per EP-004: engines running, protected-side doors unlocked, driver with vehicle
- Route confirmed valid against current picture (traffic, closures, EP-016 alerts) - alternate selected if not
- Advance vehicle departure lead time: [X minutes] - N-A if none assigned
- Principal door-to-vehicle move in OPORD close-escort formation - no curb wait
- Embus order executed per EP-004
- Departure call made on detail net: element / principal count / route letter / ETA
Arrival point serial
Clone per arrival at a venue or controlled point.
- [point - e.g. Venue A]
- Arrival point cleared against EP-002 advance geometry: box controlled, door confirmed, hold route open
- Two-minute-out call made on venue net
- Venue contact alerted per liaison record
- Debus per EP-004 order: escort out first, principal moves on escort signal, no open-air wait
- Vehicles repositioned to staging point per EP-002; drivers remain on net
- One vehicle held in immediate-recall state for the duration of the visit
Departure and return serial
Clone per venue departure back toward a controlled point.
- [leg - e.g. Venue A → Residence]
- Exposed segment re-cleared before principal is committed (conditions re-checked, not assumed unchanged from arrival)
- Return route confirmed against current picture - alternate used over default inbound route where OPORD provides one (pattern avoidance)
- Departure call made on detail net
- Arrival-home call made on detail net
- Accountability confirmed: principal, party, all elements
05 * Principal Interface Standard
How the detail communicates with the principal and family office today - who speaks, what gets logged. → EP-023 SS9 Principal Interface Standard.
- Single interface confirmed: Detail Leader / designated Shift Lead - name/initials: [ ]
- All schedule and security requests redirected to that channel by other operators
- Protective advice given today: [topic] - risk stated: [ ] - principal decision: [accepted / declined] - posture adjustment made: [ ] - logged: [Yes]
- Client-imposed risk acceptance today (declined escort / unscheduled stop): [Yes / No]
- If yes: logged same day: [ ] - routed to EP-017 reporting: [ ]
- Chronic-acceptance pattern flagged: [Yes / No] → if yes, Team Leader-client conversation, not silent absorption
- Discretion maintained - no detail conversation on the principal beyond operational need, in vehicles or venues
- Family / staff treated per OPORD party scope
06 * Running Decision Points
The in-the-moment authorities that keep deviations lawful and logged rather than improvised. → EP-023 SS10 Running Decision Points.
Decision log entry serial
Clone per decision exercised today.
- [decision - e.g. switch to briefed alternate route]
- Authority exercised: [Shift Lead / Detail Leader / Team Leader / Any operator]
- Decision type: [route switch / unbriefed improvisation / movement delay / itinerary cancel-reorder / posture step-up / emergency declaration / stand-down]
- Basis: [ ]
- Reported to: [ ] - method: [ ]
- Time: [ ]
- Notes: [ ]
Standing authority table (reference - do not edit in field)
-
Switch to briefed alternate route: Shift Lead (driver executes) - report with route letter
-
Unbriefed route improvisation: Detail Leader only - only when all briefed alternates are invalid
-
Delay a movement inside itinerary slack: Shift Lead - inform principal interface
-
Cancel or reorder an itinerary item: Team Leader with principal - per OPORD no-go criteria
-
Posture step up (band crossing): Shift Lead up, Team Leader confirms - per EP-021 threat-change rule
-
Declare emergency / execute EP-025 drill: Any operator - net goes flash per EP-011
-
Stand down from emergency posture: Detail Leader - after accountability and assessment
-
Decision: [ ] EP-025 drill triggered today - [Yes / No] - if yes, hand off to EP-025 map, resume this map at recovery per SS00 boundary check
99 * Execution Admin
The audit trail for today’s cycle - not a deliverable section itself; feeds EP-017 reporting and the next EP-021 cycle. → EP-023 running admin across all sections; closes SS00 gates opened at cycle start.
Deviation / decision log (running, this cycle)
- [deviation or decision - ref branch/leaf] → logged time [ ] - reported to [ ]
- [item 2]
Product / report register
- EP-017 client report items queued from today’s risk acceptances or deviations
- EP-025 after-action items if a drill fired today
- Daily log (EP-021) closed and filed
Sign-offs
- Shift Lead sign-off: [initials / time]
- Team Leader sign-off (if escalation occurred): [initials / time]
- Detail Leader sign-off (cycle close): [initials / time]
Open actions / RFIs carried to next cycle
- [open item]
- [open item 2]