[DETAIL - ENGAGEMENT REF] - Detail Execution Map

EP-023 Detail Execution Playbook - day-of-operations workspace for a deployed overt protective detail. Central topic = today’s detail (one engagement reference, one 24-hour cycle). Branches = the playbook’s phases and gates in execution order, from shift start to rest-overnight reset. Tick each leaf as the element completes it; log deviations and decisions where the branch calls for it, not after the fact. executes EP-023 Detail Execution Playbook in full; runs inside the EP-021 battle rhythm and under the EP-010 OPORD, which this map does not replan. Clone this whole map per detail-day.

00 * Process Plan - Gates & Triggers

The trigger that opens today’s detail cycle and the boundary conditions that must hold before any movement is committed. EP-023 SS1 Purpose and Boundaries.

Boundary check

  • Governing OPORD confirmed current: EP-010 ref [ ]
  • Today’s brief (EP-016) read by all posted personnel before the principal’s day starts
  • Comms settings (EP-011) and standing post orders (EP-009) confirmed unchanged since last cycle
  • No-go / abort criteria for today’s movements extracted from the OPORD and briefed
  • Decision: [ ] Detail cleared to open today’s cycle - authority: Team Leader

Handoff boundaries (do not improvise these)

  • Immediate-action triggers (contact / medical / fire / evacuation) mapped to EP-025 drills under the EP-012 plan - confirmed briefed, not exercised ad hoc
  • Handoff point and resume point for an EP-025 drill understood by every position
  • Notes / boundary exceptions today: [ ]

00b * Battle Rhythm & Triggers

Where today’s cycle sits inside the standing battle rhythm; the cadence and handover triggers this detail-day inherits and closes out. EP-023 SS2 step 1 (arrival per EP-021 cycle) and SS8 step 4 (daily log closure, next-day M-hour) - binds to EP-021 in full.

  • Today’s M-hour and first movement time confirmed against the EP-021 daily cycle
  • Posture band for today read from the daily brief: [Low / Moderate / Elevated / High / Critical]
  • Escalation trigger (posture step-up on band crossing): 06 Running Decision Points
  • Evening sync scheduled - time: [ ]
  • Daily log carried forward from prior cycle reviewed for open items

01 * Shift Start / Handover

Arrival, kit, comms, and handover sequence before any element takes post or the principal’s day begins. EP-023 SS2 Shift Start.

  • Arrived per EP-021 daily cycle; daily brief (EP-016) read before taking post
  • Kit and vehicle checks complete per SYS-009 / SYS-010 checklists
  • Deficiencies reported to Shift Lead: [ ] - before principal’s day starts, not after
  • Comms check all nets per EP-011 complete
  • Duress word confirmed: [ ]
  • Common operating picture (ART-common-operating-picture) live on all required devices
  • Today’s movement set, arrival geometry (EP-002 venue advance), and no-go/abort criteria confirmed

Handover serial

Clone per relieving element / post. EP-023 SS2 step 4; procedure per EP-021 SS3.

  • [position / net - e.g. Post 2 / Command net]
    • Outgoing element briefs status, open items, and any unresolved deviation
    • Oncoming Shift Lead accepts handover by name on the command net
    • Post orders (EP-009) reconfirmed current for this position
    • Time of handover: [ ]
    • Notes / discrepancies: [ ]
  • [position / net 2]
    • Outgoing element briefs status, open items, and any unresolved deviation
    • Oncoming Shift Lead accepts handover by name on the command net
    • Post orders (EP-009) reconfirmed current for this position
    • Time of handover: [ ]
    • Notes / discrepancies: [ ]

02 * Static / RON Posture

Venue occupation while static and rest-overnight posture at day’s close - the two states where the detail is not moving. EP-023 SS6 Venue Occupation and SS8 Rest-Overnight (RON) Reset.

Venue occupation (static posture)

  • Posts assigned per EP-009 and OPORD task matrix: access point coverage, hold security, close cover
  • Hold route walked by at least one operator on arrival; door state and egress confirmed
  • Crowd / access rhythm watched against advance baseline (staff flow, badge status)
  • Anomaly observed: [unscheduled staff / unbadged access / fixated person - ATAP indicator] reported on detail net and logged
  • Principal internal movements announced on net before they happen
  • Formation collapse/expand executed per space and OPORD defaults
  • Net discipline maintained - routine traffic held, net clear for exception traffic

RON reset (end of cycle)

  • Residence / hotel posture established per EP-009 before manning reduces
  • Vehicles: fuel level [>=3/4], faults reported: [ ], kit restowed per SYS-010, then secured
  • Radios and handsets on charge
  • Medical kit seals checked - discrepancies logged
  • Daily log closed per EP-021
  • Next-day M-hour and first movement confirmed at evening sync
  • Overnight watch posted: [Yes / No] - handover per EP-021 SS3 if yes
  • Overnight exception reporting channel confirmed per EP-011

03 * Movement Serials

En-route crew discipline for every leg run today. Governed by EP-004; this branch is the execution checklist, not the movement plan itself. EP-023 SS4 Movement Execution.

Movement leg serial

Clone per leg run today.

  • [leg - e.g. Residence Venue A (Route Bravo)]
    • Positions and spacing set per EP-004 for today’s vehicle count
    • Protection vehicle maintains sight of principal vehicle throughout
    • Waypoint calls made at OPORD-designated points
    • Route deviation called before the turn: [Yes / N-A]
    • Driver drives only; escort observes and communicates; navigation load off the wheel
    • Planned halts only, at EP-003 surveyed points: [ ]
    • Unplanned halt occurred: [Yes / No] - if yes, minimum duration, escort dismount per formation drill
    • Route deviation authority exercised: 06 Running Decision Points
    • Forced deviation (blockage / police direction): [ ] - new route letter reported immediately: [ ]
    • Possible-follow indicator logged: [ ] - format per EP-008; confirmation run tasked to EP-024, not improvised with principal aboard
    • Departure call made (element / principal count / route letter / ETA): [ ]
    • Notes / decision log: [ ]
  • [leg 2]
    • Positions and spacing set per EP-004 for today’s vehicle count
    • Protection vehicle maintains sight of principal vehicle throughout
    • Waypoint calls made at OPORD-designated points
    • Route deviation called before the turn: [Yes / N-A]
    • Driver drives only; escort observes and communicates; navigation load off the wheel
    • Planned halts only, at EP-003 surveyed points: [ ]
    • Unplanned halt occurred: [Yes / No] - if yes, minimum duration, escort dismount per formation drill
    • Route deviation authority exercised: 06 Running Decision Points
    • Forced deviation (blockage / police direction): [ ] - new route letter reported immediately: [ ]
    • Possible-follow indicator logged: [ ] - format per EP-008; confirmation run tasked to EP-024, not improvised with principal aboard
    • Departure call made (element / principal count / route letter / ETA): [ ]
    • Notes / decision log: [ ]

04 * Arrival / Departure Sequences

The three point-transitions of the day: leaving the residence, arriving at a venue, and the departure/return leg. EP-023 SS3 Residence Departure Sequence, SS5 Arrival Sequence, SS7 Departure and Return.

Departure point serial

Clone per departure from a controlled point (residence or venue).

  • [point - e.g. Residence]
    • Exterior check of departure point and vehicle line complete before principal is committed (EP-009 residence posts where manned)
    • Vehicles staged per EP-004: engines running, protected-side doors unlocked, driver with vehicle
    • Route confirmed valid against current picture (traffic, closures, EP-016 alerts) - alternate selected if not
    • Advance vehicle departure lead time: [X minutes] - N-A if none assigned
    • Principal door-to-vehicle move in OPORD close-escort formation - no curb wait
    • Embus order executed per EP-004
    • Departure call made on detail net: element / principal count / route letter / ETA

Arrival point serial

Clone per arrival at a venue or controlled point.

  • [point - e.g. Venue A]
    • Arrival point cleared against EP-002 advance geometry: box controlled, door confirmed, hold route open
    • Two-minute-out call made on venue net
    • Venue contact alerted per liaison record
    • Debus per EP-004 order: escort out first, principal moves on escort signal, no open-air wait
    • Vehicles repositioned to staging point per EP-002; drivers remain on net
    • One vehicle held in immediate-recall state for the duration of the visit

Departure and return serial

Clone per venue departure back toward a controlled point.

  • [leg - e.g. Venue A Residence]
    • Exposed segment re-cleared before principal is committed (conditions re-checked, not assumed unchanged from arrival)
    • Return route confirmed against current picture - alternate used over default inbound route where OPORD provides one (pattern avoidance)
    • Departure call made on detail net
    • Arrival-home call made on detail net
    • Accountability confirmed: principal, party, all elements

05 * Principal Interface Standard

How the detail communicates with the principal and family office today - who speaks, what gets logged. EP-023 SS9 Principal Interface Standard.

  • Single interface confirmed: Detail Leader / designated Shift Lead - name/initials: [ ]
  • All schedule and security requests redirected to that channel by other operators
  • Protective advice given today: [topic] - risk stated: [ ] - principal decision: [accepted / declined] - posture adjustment made: [ ] - logged: [Yes]
  • Client-imposed risk acceptance today (declined escort / unscheduled stop): [Yes / No]
    • If yes: logged same day: [ ] - routed to EP-017 reporting: [ ]
    • Chronic-acceptance pattern flagged: [Yes / No] if yes, Team Leader-client conversation, not silent absorption
  • Discretion maintained - no detail conversation on the principal beyond operational need, in vehicles or venues
  • Family / staff treated per OPORD party scope

06 * Running Decision Points

The in-the-moment authorities that keep deviations lawful and logged rather than improvised. EP-023 SS10 Running Decision Points.

Decision log entry serial

Clone per decision exercised today.

  • [decision - e.g. switch to briefed alternate route]
    • Authority exercised: [Shift Lead / Detail Leader / Team Leader / Any operator]
    • Decision type: [route switch / unbriefed improvisation / movement delay / itinerary cancel-reorder / posture step-up / emergency declaration / stand-down]
    • Basis: [ ]
    • Reported to: [ ] - method: [ ]
    • Time: [ ]
    • Notes: [ ]

Standing authority table (reference - do not edit in field)

  • Switch to briefed alternate route: Shift Lead (driver executes) - report with route letter

  • Unbriefed route improvisation: Detail Leader only - only when all briefed alternates are invalid

  • Delay a movement inside itinerary slack: Shift Lead - inform principal interface

  • Cancel or reorder an itinerary item: Team Leader with principal - per OPORD no-go criteria

  • Posture step up (band crossing): Shift Lead up, Team Leader confirms - per EP-021 threat-change rule

  • Declare emergency / execute EP-025 drill: Any operator - net goes flash per EP-011

  • Stand down from emergency posture: Detail Leader - after accountability and assessment

  • Decision: [ ] EP-025 drill triggered today - [Yes / No] - if yes, hand off to EP-025 map, resume this map at recovery per SS00 boundary check

99 * Execution Admin

The audit trail for today’s cycle - not a deliverable section itself; feeds EP-017 reporting and the next EP-021 cycle. EP-023 running admin across all sections; closes SS00 gates opened at cycle start.

Deviation / decision log (running, this cycle)

  • [deviation or decision - ref branch/leaf] logged time [ ] - reported to [ ]
  • [item 2]

Product / report register

  • EP-017 client report items queued from today’s risk acceptances or deviations
  • EP-025 after-action items if a drill fired today
  • Daily log (EP-021) closed and filed

Sign-offs

  • Shift Lead sign-off: [initials / time]
  • Team Leader sign-off (if escalation occurred): [initials / time]
  • Detail Leader sign-off (cycle close): [initials / time]

Open actions / RFIs carried to next cycle

  • [open item]
  • [open item 2]